Buildings
Bengaluru, Karnataka
Brigade Opus
Freyssinet India carried out design, supply, and installation of 34,391 sq. meter of PT slab and 3.05 MT of PT beam
Buildings
Bengaluru, Karnataka
L&T Tech Park
Supply of post tensioning materials, design and installation of 1,65,000 sq. m. PT area using Freyssinet bonded system.
Bridge
Mumbai, Maharashtra
Mumbai Trans Harbour Link (MTHL)
PT Strand Spec (First time in India) Internal bonded & external unbonded Post Tensioning system
Special Bridge
Chenab, J&K
Special Bridge, River Chenab
Fabrication and installation of 100T capacity Prestressed cable anchors at slopes below S50 using our innovative technique & high-quality standard.
Bridge
Kota, Rajasthan
Chambal Cable Stayed Bridge
The strands have seven wires of class 1860 mpa and stay cables unities vary from 58 to 91 strands.
Buildings
Mumbai, Maharashtra
Artesia Tower Metal Box
Supply of post tensioning materials, design & installation of 157.36 MT vertical pressing at lift core wall using Freyssibar of 50mm dia & capacity 2170 MT
Bridge
Bardhman, West Bengal
Bardhman Cable Stayed Bridge
The RoB, considered to be the second largest in the country, was completed in 197 days without affecting single-day traffic operation
Buildings
Pragati Maidan, New Delhi
Additional Office Complex (AOC) for the Supreme Court of India
Fabrication and installation of Prestressed cable anchors under fully submerged condition
Bridge Repair
Ranaghat, West Bengal
Rehabilitation of Over Bridge, River Churni
Complete survey and investigation of the bridge, strengthening, replacement of main cable and anchorages