The stays are in a single plane with a semi harp arrangement and are anchored every 7 m in the deck. The 80 m high pylons.
-
LocationKota, Rajastan
-
ClientHyundai Engineering & Construction
-
Awarded2012
-
StatusCompleted
The project
Supply and Installation of Stay Cable Work, PT Work & Construction and Operation of Form Traveller Work
The stay cables are composed of individually sheathed strands having a triple protection, galvanization, wax filling and individual polyethylene sheet. The external cable duct has helicoids in order to eliminate rain and wind induced vibrations.
-
1100 mLength of the Bridge
-
30 mWidth
-
125 mPylons
Contact us
You have a question about our solutions or you already have a project in mind? Please fill out the form below and our teams will get back to you shortly.