The Indian Railways has completed the construction of the giant four-lane cable-stayed railway over bridge at Burdwan Junction in West Bengal.

  • Location
    Bardhman, West Bengal
  • Client
    GPT Infra Pvt. Ltd.
  • Awarded
    2013
  • Status
    Completed
The project

Supply and Installation of Stay Cable Work, PT Work & Construction and Operation of Form Traveller Work

The work on 188.43 metre cable-stayed RoB began in 2012. Besides having 1.5 metre-wide footpaths on each of the sides parallel to the lanes, the RoB has 27.7 metres of width to accommodate vehicles on four lanes.

One meter clearance available during construction from the train live electrical supply. The Girders have been placed over electrified tracks with the specially designed crane.

  • 188.43 m
    Length of the Bridge
  • 27.7 m
    Width of bridge deck
  • 1.5 m
    Footpath on both sides